Interface routes compileNext.js production build
PASSEDFinal batch control
Governance and release assurance
Verify permissions, audit history, lineage, export context, and release gates before the demonstration build is closed.
Controlled demonstration recordsLocal mock case records · CIS connector hosted on Neon project ECOSYSTEM · No external live source or production write.
FINAL CONTROL · GOV-1.0
Demonstration release is complete
9 of 10 release controls pass. Production release remains blocked until live-source transport and production writes receive separate approval.
90%9/10 controls passedProduction blocked
Release acceptance gates
Passing the interface batch does not authorize a live database, external transport, or production write.
Type contracts validateTypeScript zero-error check
PASSEDProfessional states remain separateINL-1.0 state rules
PASSEDAssessment method is declaredPERA-1.0 methodology
PASSEDDecision gates prevent false issuanceRequired evidence blocking
PASSEDSnapshot context is preservedSnapshot and export manifests
PASSEDRole permissions are declaredGOV-1.0 permission matrix
PASSEDMaterial actions are auditableImmutable demonstration ledger
PASSEDProduction database is connectedCIS connector · Neon project ECOSYSTEM · server-side read only
PASSEDLive sources and production writes are approvedExternal transport disabled
BLOCKEDRole permission matrix
Interface visibility never substitutes for enforced authorization.
| Role | view | capture | verify | accept | adjust | approve | export |
|---|---|---|---|---|---|---|---|
| PROPERTY_ANALYST | |||||||
| EVIDENCE_REVIEWER | |||||||
| SENIOR_REVIEWER | |||||||
| AUDIT_OBSERVER |
Controlled export manifest
Export context is explicit before a file can be produced.
- ID
- EXP-2026-0012
- Subject
- PROP-MNL-0042
- Snapshot
- SNP-2026-0032
- Dataset
- DEMO-2026-08-04-B03
- Method
- PERA-1.0
- Scope
- ACCEPTED_EVIDENCE_ONLY
- Currency
- PHP
- Limitations
- 2
- Confidentiality
- INTERNAL_DEMONSTRATION
Material action audit ledger
6 immutable demonstration events · display actions are excluded from the professional ledger
| Audit ID | Action | Record | Responsible entity | Previous | New | Timestamp |
|---|---|---|---|---|---|---|
| AUD-0041 | SUBJECT_RECORD_CREATED | PROP-MNL-0042 | PROPERTY_ANALYST | NONE | DRAFT | 2026-08-04T18:15:00+08:00 |
| AUD-0042 | EVIDENCE_VERIFIED | EVD-2026-0184 | EVIDENCE_REVIEWER | PENDING | VERIFIED | 2026-08-04T18:42:00+08:00 |
| AUD-0043 | EVIDENCE_ACCEPTED | EVD-2026-0184 | EVIDENCE_REVIEWER | VERIFIED | ACCEPTED | 2026-08-04T18:49:00+08:00 |
| AUD-0044 | COMPARABLE_INCLUDED | CMP-MNL-0108 | PROPERTY_ANALYST | CANDIDATE | INCLUDED | 2026-08-04T19:06:00+08:00 |
| AUD-0045 | ASSESSMENT_CALCULATED | ASM-PERA-0007 | SYSTEM_PROCESS | DRAFT | BLOCKED | 2026-08-04T20:45:00+08:00 |
| AUD-0046 | SNAPSHOT_PREPARED | SNP-2026-0032 | SENIOR_REVIEWER | NONE | DRAFT_BLOCKED | 2026-08-04T20:52:00+08:00 |
Evidence-to-snapshot lineage
Every professional conclusion remains traceable through controlled state transitions.
Final INL release stateSystem status remains truthful: final demonstration complete; production authority blocked.
ID=REDE-V1-B04. G=GRID_RELEASE_CONTROL. E=FOUNDER_DIRECT_COMMAND. S=BLOCKED. X=FINALIZE_BATCH_04_DEMO_COMPLETE_true_CONTROL_SCORE_90_PRODUCTION_READY_false. T=2026-08-04T21:10:00+08:00.